Event Calendar
Prev MonthPrev Month Next MonthNext Month
Medstar Georgetown University Hospital Jobsite Tour
Thursday, May 25, 2023, 3:00 PM - 4:00 PM EDT
Category: Events

Medstar Georgetown University Hospital Jobsite Tour
May 25, 2023, 3:00pm - 4:00pm

Hosted by the ASAMW Frontrunners
No Cost, but space is limited. Register Today.

Join ASAMW and representatives from Shapiro and Duncan and Clark Construction as they walk us through MedStar Georgetown University Hospital Medical/Surgical Pavilion. Space is extremely limited, so be sure to register today.  

About the project: Total project is 838,000 SF.  It consists of a 480,000 SF, six-story expansion to the existing hospital, featuring a 33-bay emergency department, 32 operating rooms with prep/recovery beds on two levels, and 156 intensive care unit (ICU) beds on three levels. From lower to higher floors, the building will be composed of a new underground loading dock, material management area, and central sterile processing areas incorporated into the basement level; emergency department and main entrance on the ground floor; two floors of surgery, prep/recovery areas and support areas; followed by three levels of ICU patient rooms, as well as a penthouse equipped with space for three 2MW emergency power generators. The new addition will connect to the Georgetown University central chilled water, steam, and condensate systems. The facility will also include a roof-mounted helipad, a 350,000 SF, three-level underground parking garage to accommodate 650 spaces, and a utility service tunnel.